Skip to main content

Search form

Outage Map
Contact Us
My Account
Get Beacon Broadband!
Home
  • Member Resources
    • Member Services
      • Online Account & Mobile App
      • Payment Methods
      • Pre-Pay Power
      • Rate Schedule
      • Member Benefits
      • Energy Assistance
      • Round-Up Program
      • New Electric Service
  • About Us
    • About Us
      • About Your Co-Op
      • Management Team
      • Service Area
      • Office Locations
      • Our Power Source
      • Capital Credits
      • Charitable Giving
      • Careers
      • Contact Us
    • Governance
      • Board of Directors
      • Articles of Incorporation and Bylaws
      • Policies
      • Annual Meeting
      • CCEC Annual Report
  • Outages & Safety
    • Outages
      • Outage Center
      • Outage Map
      • Public Safety Power Shutoff
    • Safety
      • Electrical Safety
      • Wildfire Mitigation
      • Tree Trimming Requests
      • Call Before You Dig
  • Rebates & Programs
    • Rebate Programs
    • Energy Conservation
    • Home Efficiency Tool
    • Net Metering
    • Electric Vehicles
      • EV Charging Program
  • Community
    • Cooperative News
      • Recent News
      • Ruralite Magazine
      • Scam Awareness
    • Community
      • Coos-Curry Electric Charitable Foundation
        • Financial Peace University
        • Luck of the Draw Scholarship Application
        • CCECF Bright Ideas Grant
      • CCEC Kid's Corner
        • Safety Demonstrations
      • Youth Tour
      • CCEC Scholarships
      • Heroes Among Us
Menu

CCEC Rate Schedule as of March 1, 2024

Coos-Curry Electric Cooperative is dedicated to powering your life with safe, reliable, and cost-based energy. Electric rates for members are voted on by the board of directors after a comprehensive analysis that assesses various cost factors, such as operational expenses, planned infrastructure investments, materials, and wholesale power rates. 

Rate Increase Announcement

2025 Rate Schedule Summary -Effective May 1, 2025

  • Residential Service
  • General Service
  • Prepay Service
  • Small Commercial
  • Large Power
  • Commercial High Load
  • Irrigation Service
  • Yard, Security & Public Street Lighting
  • Net-Metering

Rate Availability

This Residential rate is available to farm and residential consumers and separately metered water pumps not used for irrigation, and to any cottage, cabin, trailer site or residence which is a secondary place of residence. The capacity of individual motors served under this schedule shall not exceed 10 hp each. Service availability is subject to the established rules and regulations of the Cooperative.

Type of Service

The type of service is 60 hertz, alternating current, single phase, 120/240 volts. Service will be through a single meter at one point of delivery. Additional service at other points of consumption will be separately metered and billed.

Rate

  • Base-Charge (includes no energy): $34.65 per meter per month (minimum)
  • Energy Charge: 9.56¢ Per kWh per meter

Effective Date: March 1, 2024

Rate Availability

This rate is available to consumers having a maximum demand of less than 30 kW for 10 months in the preceding 12-month period. Service availability is subject to the established rules and regulations of the Cooperative. When metered usage is for multiple classes, the primary usage shall determine which rate and class is assigned.

Type of Service

The type of service is 60 hertz, alternating current, of such phase and voltage as may be available. Service will be through a single meter at one point of delivery under one phase and voltage. Additional service at other points of consumption or at different voltage and phase will be separately metered and billed.

Rate

Energy Charge:

  • 9.56¢ Per kWh per meter

Base-Charge (includes no energy)

  • Single Phase: $45.36 per meter per month 
  • Three Phase: $58.61 per meter per month

Minimum Monthly Charge:

The minimum monthly charge shall be the base charge or as established in a contract for electric service.

Effective Date: March 1, 2024

Rate Availability

This prepay rate is supplemental to the member’s current rate schedule and is provided in accordance with Coos-Curry Electric Cooperative, Inc.’s (CCEC) prepay policy.

Type of Service

Type of service is 60 hertz, alternating current, single phase, 120/240 volts that apply to the member’s applicable rate schedule.

Rate

The member's bill is calculated from the following components:

  • Energy Charge:
    • The member will be billed an energy charge equal to the rate class of the prepay service.
  • Base Charge (includes no energy):
    • The member will be billed a monthly base charge equal to the basic charge for the rate class of the prepay service. The monthly base charge will be annualized then divided by 365 days to determine the daily billing charge.

Effective Date: March 1, 2024

Rate Availability

This rate is available to all consumers whose kW demand during any two of the preceding 12 months has been 30 kW or greater. Service availability is subject to the established rules and regulations of the Cooperative.

Type of Service

The type of service is 60 hertz, alternating current, of such phase and voltage as may be available. Service will be through a single meter at one point of delivery under one phase and voltage. Primary service installed and existing electric loads served prior to February 24, 2006, will continue to be served at the small commercial rate. Additional service at other points of use or at different voltage and phase will be separately metered and billed.

Rate

Energy Charge:

  • Single Phase: 6.89¢ per kWh per month
  • Three Phase: 7.00¢ per kWh per month

Base Charge (includes no energy):

  • Single Phase: $74.50 per meter per month
  • Three Phase: $128.00 per meter per month

Demand Charge:

  • Single Phase: $9.68 per kW of demand per month
  • Three Phase $9.62 per kW of demand per month

Minimum Monthly Charge:

The minimum monthly charge shall be the base charge or as established in a contract for electric service.

Effective Date: March 1, 2024

Rate Availability

The rate available to all consumers whose kW demand during any of the preceding 12 months has been 1,000 kW or greater. Service availability is subject to the established rules and regulations of the Cooperative.

Type of Service

The type of service is 60 hertz, alternating current, of such phase and voltage as may be available. Service will be through a single meter at one point of delivery under one phase and voltage. Primary service installed and existing electric loads served prior to February 24, 2006, will continue to be served at the large power rate. Additional service at other points of use or at different voltage and phase will be separately metered and billed.

Rate

Energy Charge

  • All kWh per month: 6.25¢

Base Charge (includes no energy):

  • $500.00 per meter per month

Demand Charge:

  • $10.06 per kW of demand per month

Minimum Monthly Charge

The minimum monthly charge shall be the base charge plus the greater of the demand charge or the kVA charge. The kVA charge is $4.08 per kVA per month of required transformer capacity, or as established in a contract for electric service. The minimum kVA charge shall be $122.40 per month.

Effective Date: March 1, 2024

Rate Availability

Available to all consumers with a load factor of 90% or greater whose kW demand during any of the preceding 12 months has equaled or exceeded 100 kW and less than 10 MW. If the load factor falls below 90% for three or more months in a 12-month period, the billing for that meter will be transferred to the appropriate commercial rate class. Service availability is subject to the established rules and regulations of the Cooperative.

Type of Service

The type of service is 60 hertz, alternating current, of such phase and voltage as may be available. Service will be through a single meter at one point of delivery under one phase and voltage. Additional service at other points of use or at different voltage and phase will be separately metered and billed.

Rate

Energy Charge:

  • All kWh’s per month 3.84 ¢ per kWh

Base Charge (includes no energy):

  • $66.12 per meter per month

Demand Charge

  • $21.98 per kW of demand per month

Minimum Monthly Charge:

The minimum monthly charge shall be the base charge plus the greater of the demand charge or the kVA charge. The kVA charge is $4.20 per kVA per month of required transformer capacity, or as established in a contract for electric service.

Effective Date: March 1, 2024

Rate Availability

Available to consumers for irrigation pumping, subject to the established rules and regulations of the Cooperative.

480 volt service is available only for motors rated 50 hp or greater. Single phase service is limited to motors rated fractional through 10 hp. Unless three phase service is existing, three phase service is limited to motors rated 5 hp or greater.

Rate

Energy Charge:

  • Single Phase: All kWh’s per month 8.31 ¢ per kWh
  • Three Phase: All kWh’s per month 8.71 ¢ per kWh

Base Charge (includes no energy):

  • Single Phase: $29.61 per meter per month
  • Three Phase: $50.10 per meter per month

Demand Charge:

  • $0 per kW for 0-30 kW of demand per month
  • $8.85 per kW of demand greater than 30 kW per month

Effective Date: March 1, 2024

Rate Availability

Available for controlled and dusk-to-dawn lighting systems for public street lighting and for yard or security lighting, subject to the established rules and regulations of the Cooperative.

Monthly Rate

Private Yard or Security Lighting:

  • 1 - 100 watt: $19.11
  • 2 - 175 watt: $19.11
  • 3 - 200 watt: $25.48
  • 4 - 250 watt: $25.48
  • 5 - 400 watt: $25.48

Public Street Lighting:

  • 11- 100 watt: $19.11
  • 12- 175 watt: $19.11
  • 13- 200 watt: $25.48
  • 14- 250 watt: $25.48
  • 15- 400 watt: $25.48


Conditions of Service

Private and public lighting equipment, including lamps, fixtures, necessary circuits, transformers, and additional guys and fittings, will be furnished and installed on poles by the Cooperative. The annual minimum charge will be twelve (12) times the appropriate monthly charge.

Net-Metering

CCEC will install metering equipment capable of measuring bi-directional electric energy flow separately as follows: (a) the electrical energy delivered by CCEC to the member-generator, and (b) the electrical energy delivered by the member-generator to CCEC. Metering equipment shall be capable of metering both energy (in kilowatt-hours) and demand (in kilowatts), if necessary, to bill member-generator under CCEC’s appropriate rate schedule.

Rate

Member-generator net-metering monthly bill is calculated from the following components:

  • A. Base Charge: The member-generator will be billed the monthly base charge equal to the rate class of the net-metered service.
  • B. Demand Charge: The member-generator will be billed the demand charge (kW) equal to the rate class of the net-metered service for energy supplied by CCEC. No demand charge credits will be given to the member-generator for energy generated by the member-generator.
  • C. Energy Charge and Credit:
    • C1: Energy supplied by Cooperative: Energy supplied from CCEC (forward energy flow) over a given billing period.
    • C2: Energy supplied by member-generator: Generated energy supplied to CCEC (reverse energy flow) over a given billing period.

Net-Metering Monthly Bill Calculation

Total Monthly Bill = A + B + C1 - C2

  • Where A = the base charge of the rate class of the metered service
  • Where B = the demand charge, if applicable, for the rate class of the metered service
  • Where C1 = the energy charge for energy supplied by Cooperative for the rate class of the metered service
  • Where C2 = the energy credit for energy supplied by member-generator

If, over a given billing period, C2 is greater than C1, the difference in kWh’s shall be banked and used to offset future consumption. Annually, or more frequently if determined by CCEC, any remaining unused, banked kWh will be credited to the member-generator at the avoided cost rate or granted to CCEC’s low-income energy assistance program, as elected by the member-generator.

Back to Top

Mailing Address

Coos- Curry Electric Cooperative, Inc.

PO BOX 4279

Brookings, OR 97415

Office Hours

Monday through Thursday

8:00 am to 5:00 pm

Phone Numbers

24/7 Outage & Information:

(866) 352-9044

Member Services:

(541) 332-3931

 

Follow Us

©2025 Coos-Curry Electric Cooperative. A Touchstone Energy Cooperative

  • Member Resources
    • Member Services
      • Online Account & Mobile App
      • Payment Methods
      • Pre-Pay Power
      • Rate Schedule
      • Member Benefits
      • Energy Assistance
      • Round-Up Program
      • New Electric Service
  • About Us
    • About Us
      • About Your Co-Op
      • Management Team
      • Service Area
      • Office Locations
      • Our Power Source
      • Capital Credits
      • Charitable Giving
      • Careers
      • Contact Us
    • Governance
      • Board of Directors
      • Articles of Incorporation and Bylaws
      • Policies
      • Annual Meeting
      • CCEC Annual Report
  • Outages & Safety
    • Outages
      • Outage Center
      • Outage Map
      • Public Safety Power Shutoff
    • Safety
      • Electrical Safety
      • Wildfire Mitigation
      • Tree Trimming Requests
      • Call Before You Dig
  • Rebates & Programs
    • Rebate Programs
    • Energy Conservation
    • Home Efficiency Tool
    • Net Metering
    • Electric Vehicles
      • EV Charging Program
  • Community
    • Cooperative News
      • Recent News
      • Ruralite Magazine
      • Scam Awareness
    • Community
      • Coos-Curry Electric Charitable Foundation
        • Financial Peace University
        • Luck of the Draw Scholarship Application
        • CCECF Bright Ideas Grant
      • CCEC Kid's Corner
        • Safety Demonstrations
      • Youth Tour
      • CCEC Scholarships
      • Heroes Among Us